Serving Southern California — San Diego, Orange, Riverside & Los Angeles counties
Electricians performing rough electrical work on an active residential construction site
  1. Home
  2. Services
  3. Electrical Subcontracting for Builders
Electrical subcontracting

Electrical Subcontracting for Builders & General Contractors

Bid from the plan set, scheduled against your dates, and on site when the framing is ready.

J.I.C. Electric works as the electrical subcontractor on residential and light commercial projects — plan review and bidding, rough-in, trim, change coordination and inspection.

Scope of work

What J.I.C. Takes On

Project-based electrical support, from bid review through final inspection.

  • Plan Review & Bidding

    Electrical and architectural sheets reviewed, questions raised before the bid rather than after award.

  • Scoped Written Bids

    Bids that state inclusions, exclusions and assumptions so the comparison is real.

  • Temporary Power

    Site power set up and maintained through the build where required.

  • Electrical Rough-In

    Boxes, cans, home runs and panel set during framing, coordinated with plumbing and HVAC.

  • Service & Meter Coordination

    Service size, meter location and utility coordination handled with the jurisdiction and the utility.

  • Trim & Finish

    Devices, fixtures, controls and legible panel labeling installed for walkthrough.

  • Change Order Coordination

    Changes priced and documented in writing as they happen, not at closeout.

  • Inspection & Corrections

    Rough, service and final inspections, with corrections carried to completion.

  • Multifamily & Light Commercial

    Larger project types where the schedule and scope fit.

    Multifamily Electrical →
What we need from you

What Makes a Bid Fast and Accurate

The more of this arrives with the request, the faster you get a real number and a straight answer on availability.

  • —Electrical, architectural and any mechanical sheets that affect routing.
  • —New build, addition, remodel, multifamily or commercial, plus square footage or unit count.
  • —Where the project is now, and when electrical is actually needed.
  • —Target rough-in date and the drywall date behind it.
  • —When you need the number, so it either arrives on time or you hear that it will not.
  • —EV, HVAC, pool, shop, appliance packages — anything that changes the service size.

J.I.C. will tell you when a project is not a fit rather than bidding it and holding your schedule hostage.

FAQ

Builder Questions

How do you handle bidding?+

Send the plan set, the bid date and the schedule. You get a scoped written bid with inclusions and exclusions stated, or a straight answer that it is not a fit.

Can you hold a rough-in date?+

Dates are committed in writing once the project is scheduled, with the drywall date as the anchor.

How are change orders handled?+

Priced and documented in writing as they come up, so nothing arrives as a surprise at closeout.

Do you coordinate with other trades?+

Yes — routing is coordinated with plumbing and HVAC, and rough-in sequencing is planned with the superintendent.

Do you handle permits and inspections?+

Electrical permitting and inspections are handled as part of the scope, coordinated with the overall permit.

What project types fit best?+

Residential new construction, additions, ADUs, major remodels and light commercial. Multifamily depends on the schedule and scope.

Project review

Submit a Project for Review

Send the plans, the bid date and the schedule. You will get a straight answer on fit and availability before a bid is promised.

  • ✓Scoped written bids with inclusions and exclusions
  • ✓Straight answer on fit and current availability
  • ✓Change orders documented as they happen